Ò°»¨ÉçÇø

Featured Case Study

pipeline-obsolescence-decommissioning

Pipeline Obsolescence: Decommissioning a Branch without Interrupting Flow

HT&P services and a STOPPLE® Train isolation modified for thick-walled pipe were instrumental in taking an obsolete natural gas plant out of service without interrupting product flow to customers.

Results

Total results 16
Dent and Gouge Assessment With MDSâ„¢ Platform
Read More
Assessment of Eastern European Pipeline with Microbial Attack
Read More
Innovation and ProStopp® DS Technology Provide the Only Option to Isolate a Pipeline with Corrosion Coating Buildup
Read More
Assessment of Pipeline Crack and Crack-like Colonies
Read More
Prioritization of Mechanical Damage Threats Avoiding Future Failures through Detection, Characterization, Sizing
Read More
Seam Assessment and Regulatory Compliance: Multiple Datasets+EMAT
Read More